OneWiss prices mobile app development individually after reviewing the requirements. The fee depends on iOS/Android platforms, features, user roles, UX/UI, backend work, integrations, testing and support scope. We clarify the project first, then prepare a proposal describing the deliverables, fees and timing.
The proposal also sets out payment milestones and VAT treatment, publishing terms and external costs. No fixed starting tariff is published. This guide helps you prepare the information needed for an estimate.
What determines the cost of a mobile app?
App features are connected. For example, a booking can involve selecting a time, checking availability, paying, receiving confirmation and cancelling. Screen count alone therefore does not describe the project: the user journey and the processes behind it also matter.
| Cost factor | What we clarify | What affects the workload |
|---|---|---|
| Platforms | iOS, Android or both | The selected approach and platform capabilities |
| Features and roles | Registration, bookings, payments, notifications | Workflows, permissions and each role's actions |
| UX/UI and screens | User journeys and design readiness | Screens, states and interaction complexity |
| Backend and integrations | Data, administration and existing APIs | New work and external system requirements |
| Testing and publishing | Devices, scenarios and stores | Verification scope and release preparation |
| Timing and support | Milestones, updates and maintenance | Delivery schedule and ongoing responsibilities |
Describe how a feature works alongside its name. Notifications could mean a single event alert or multiple scenarios for different audiences. For payments, clarify what users buy, which statuses must be tracked and which system is involved. These details form the basis of a specific proposal.
iOS, Android and device capabilities
Identify the platforms your audience needs. When both are required, agree the shared experience and where platform-specific behaviour or separate checks are needed. The technical approach is selected around the features and future maintenance needs.
List push notifications, maps, camera access, QR scanning, biometrics, Bluetooth or offline functionality early when relevant. Explain when and why each capability is needed. An offline checkbox alone does not describe which information must remain available or how it should synchronise after connectivity returns.
If you have not selected a platform yet, say so. In the app project estimate request, describe the audience and main problem; the details can be clarified during consultation.
MVP and a full release
An MVP is an initial product version with an agreed set of core capabilities. The first release should deliver a clearly defined workflow. Its features follow the project's needs; there is no single fixed MVP package or universal fee in the published offer.
Separate what must work in the first version from what can follow later. Registration, the user's main action, administration and necessary integrations need to fit together. Postponing a feature does not automatically remove the need to plan the foundations for future work.
This helps make delivery stages visible in the proposal: what is built now, what remains for later and what changes if further requirements are added. Additional work is quoted and agreed before it begins.
Design, prototypes and development
Tell us whether UX/UI designs or a prototype already exist. The files should describe core flows and screen states; a few visual layouts alone do not establish that every workflow is fully planned.
If design is also needed, its scope will be included in the proposal alongside development and testing. See the separate UX/UI design pricing guide for design-service terms. Its design fees do not represent the total cost of developing a working app.
Define what happens at sign-in, during data loading, when an error occurs and after an action succeeds. This gives designers and developers a shared task that can be checked against the brief.
Backend, administration and integrations
Beyond mobile screens, the project may need data storage, user permissions, administration and connections to external systems. Specify whether the backend and admin panel must be built or already exist.
For an existing API, documentation, information about a test environment and a technical contact are helpful. We need to understand the system's capabilities, the information it returns and any additional work required.
Define customer, manager and administrator roles through their actions: who creates a record, changes a status or views a report. Integration scope should account for the relevant provider's terms and external costs.
Testing and app store publishing
The proposal should identify which scenarios and devices will be checked, who supplies the data and how completion of each stage is confirmed. Alongside the main journey, cover the agreed error, restricted-access and connectivity scenarios.
For App Store / Google Play distribution, clarify whether developer accounts exist and who handles publishing. Check current account terms on the Apple Developer Program page and in Google Play Console's official instructions.
The release plan should cover required materials and store preparation. Publishing requires review by the relevant platform, so distinguish completion of design and development from store availability. For an internal business app, define the distribution needs separately.
External costs and ongoing support
The proposal explicitly addresses App Store / Google Play accounts, server costs, third-party services, licences and ongoing maintenance alongside development work. Some services may charge periodically or according to usage; the provider's current terms should be checked separately.
Before work starts, agree who manages the accounts, pays external costs and provides support after launch. New functionality, planned updates and handling existing issues should have their relevant terms recorded in the proposal. No universal monthly support fee or period is published.
What should the proposal contain?
OneWiss's project estimate should describe the agreed features, screens and platforms; design, development and testing stages; fees, payment milestones and VAT treatment. Publishing, support and external cost terms are also defined.
When requirements change during delivery, establish the effect on scope, timing and price first. When comparing proposals, check whether they cover the same work, particularly backend delivery, design, testing and subsequent service.
How to prepare an app brief
Provide the business activity, app objective, audience, preferred platforms and core features. List roles, integrations, existing design/backend work, the first-release scope and preferred timing. Include expected usage scale if already defined.
You can start with the mobile app project brief form. It offers a starting structure or a custom project that can be adapted to your needs. The estimate is prepared after the completed requirements are reviewed.
Frequently asked questions
How much does mobile app development cost in Georgia?
OneWiss prices the project individually after reviewing its requirements. Platforms, features, design, backend work, integrations, testing and support are clarified before a specific proposal is prepared.
Does an MVP have a fixed price?
No single tariff is published. The core MVP features and delivery scope are agreed in the brief, and the project is priced accordingly.
What if I already have designs or a backend?
Identify the existing assets and systems. Their readiness and usable scope are reviewed during estimation; their existence alone does not determine the final fee.
Can iOS and Android be included in one proposal?
If both are needed, state this in the brief. The proposal defines the chosen approach and work required for both platforms.
Are publishing and maintenance included?
Publishing, support and external cost terms are explicitly defined in the individual proposal. Describe where help is needed and whether developer accounts are already available.
How long does it take to develop an app?
Timing is agreed around features, integrations, readiness of materials and delivery stages. Store review also needs to be considered in the release plan.
See the current terms on the mobile app development page, or request an estimate for your project.
An idea creates value when it becomes action.